Trinity Baptist Church

Raleigh, North Carolina

Trinity Baptist Church opened the first unit of its permanent church facility in 1962. In 2001 Morrison Engineers provided the structural engineering for a two story building which supplied much needed classroom and office space. The building also boasts a gymnasium with a workout facility and features an elevated track.

Structural Elements:

bulletStructural Steel Beams and Columns
bulletComposite Concrete Slabs on Metal Deck
bulletCMU Shearwalls
bulletStructured Steel Braced Frame

The track is suspended from the roof structure which allows more open space at the gym floor level.

Trinity Baptist Church 1

Trinity Baptist Church 2